top of page
![](https://static.wixstatic.com/media/a3c153_6f27754e06844d62a1708b316797fc08~mv2.jpg/v1/fill/w_669,h_446,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/a3c153_6f27754e06844d62a1708b316797fc08~mv2.jpg)
Pointing
As a property gets older or a client lets climbing plants grow then the mortar fails and will need re-pointing to improve the aesthetics of a property or even prevent any potential structural issues.
![2CF915F0-43C1-4D73-90C3-11208D25C2A5.jpg](https://static.wixstatic.com/media/21ff0e_dff317cc88f34dbf8d9fb2795389fef1~mv2.jpg/v1/fill/w_378,h_283,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/2CF915F0-43C1-4D73-90C3-11208D25C2A5.jpg)
01
Chimney Repoint
A straight forward job where the bulk of the costs were in the scaffolding to reach the chimney.
02
Lime Mortar
for those older properties where the walls are a "Solid" type construction then a lime mortar is used to ensure the wall can breathe and has a higher level of flexibility over a standard cement mortar.
![IMG_3051.JPEG](https://static.wixstatic.com/media/21ff0e_bc61e1d06b964268b7e8af84daccefe1~mv2.jpeg/v1/fill/w_212,h_283,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_3051_JPEG.jpeg)
![IMG_3017.JPEG](https://static.wixstatic.com/media/21ff0e_125e58deea87408ab0bcf6eadefaac11~mv2.jpeg/v1/fill/w_212,h_283,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_3017_JPEG.jpeg)
03
Failed Flashing
This is a common issue affecting properties but the client only becomes aware when the driving rain travels down the chimney stack and into the rooms below.
We resolve this by installing new lead flashing or re-dressing the old lead.
bottom of page